All frequently asked questions

Select a question to read the answer.

25 questions

Your selected question is shown separately from the current results.

After-sales supportHow should modular container buildings be cleaned and maintained after delivery?

Clean wall panels and floors regularly, and inspect roof drainage, door and window seals, connections, coatings and utility systems. Use cleaning methods suitable for the surface material. Inspect and repair leaks, loose connections or damage promptly.

Product-related QuestionsWhat are BOXRUI’s core business areas?

Modular Buildings and Cleanroom Solutions.

General QuestionsHow can I contact BOXRUI?

Use the Contact Us form or email zgljcom@gmail.com. The confirmed website is www.zglj.com.

CustomizationHow are project configurations confirmed?

Share the required layout, materials and functional needs with our team. The configuration and service scope are confirmed for the individual project.

Product-related Questions1
General QuestionsWhat information should I include in a quotation request?

Share the product or model, intended application, estimated quantity, destination and any layout or drawing requirements. For cleanroom products, include the required materials, dimensions and interfaces. Our team can then identify which specifications need confirmation before quotation.

Product-related QuestionsWhat can modular container buildings be used for?

Modular container buildings can serve as site offices, worker accommodation, project camps, temporary housing, retail spaces, kiosks and other modular facilities. The configuration depends on occupancy, local conditions and intended use.

General QuestionsHow is the minimum order quantity confirmed?

Send the product model, configuration and estimated quantity with your enquiry. Ask the team to confirm the applicable order quantity and supply scope for that specific request before placing an order.

General QuestionsHow are shipping and delivery arrangements agreed?

Provide the destination and required delivery point. Before ordering, confirm packing, loading, transport documents, unloading and local responsibilities with the project parties. Shipping scope, delivery terms and timing are agreed for the individual order.

Product-related QuestionsWhat is the difference between flat-pack and expandable container houses?

Flat-pack units are generally assembled on site from frames and enclosure components. Expandable units unfold to create additional floor area. Compare shipping volume, installation method and interior layout against your schedule, transport constraints and intended use.

Product-related QuestionsWhen should I use machine-made or hand-assembled cleanroom panels?

Machine-made panels suit wall or ceiling applications with relatively standard specifications and higher volumes. Hand-assembled panels can accommodate some special configurations and dimensions. Selection also depends on cleanliness requirements, panel profile, loads and site installation conditions.

Product-related QuestionsHow should I choose a cleanroom panel core?

Compare core materials against fire safety and thermal insulation requirements, humidity, the use of the clean area and the project budget. Performance depends on the specific panel construction and test method. Share the target standard so that the panel specifications can be confirmed.

CustomizationCan the interior layout be customized for my project?

Layouts can be discussed based on intended use, available area and functional requirements, including office space, break rooms, accommodation partitions and common areas. Share a floor plan, dimensions and required functions so the team can assess a suitable layout.

CustomizationCan cleanroom panel thickness and length be made to drawing?

Panel thickness and length can be discussed based on production capabilities, core material, transport conditions and project drawings. Extra-long panels or special specifications can affect fabrication, packing, loading and on-site handling, so feasibility should be checked in advance.

CustomizationCan you supply cleanroom doors, windows and accessories from one materials list?

Wall panels, ceiling panels, cleanroom doors, observation windows, pass boxes and installation accessories can be discussed together using the project materials list. Confirm models, dimensions and quantities, and clarify the supply scope, brand requirements and any special equipment at the quotation stage.

QualityHow should I verify the fire performance of a cleanroom panel?

Check the test report for the applicable standard, the panel construction and the installed system. Use the evidence for the complete panel assembly when assessing fire resistance. Requirements for reaction-to-fire classification or fire-resistance duration can vary by country and project.

QualityWhat should I consider when selecting cleanroom panels for a hot and humid environment?

Consider humidity, condensation risk, surface corrosion resistance, thermal insulation and joint sealing. Cleaning frequency and temperature differences also affect material selection. Assess the panels together with the HVAC system and operating environment.

Standards & testingHow is a cleanroom classification usually tested and confirmed?

Test airborne particle concentrations under the operating conditions specified by the project's standard. The project may also require checks of airflow, pressure differentials or recovery time. A qualified testing organization normally carries out the agreed test plan.

InstallationWhat site preparations are needed before installing cleanroom panels?

Verify site dimensions, structural levels, set-out lines, material storage conditions and coordination with other trades. Check substrate flatness, equipment access routes and environmental protection measures to reduce rework.

InstallationWhat foundation is needed before installing a modular container building?

Prepare a level, stable surface or foundation that meets the project design requirements. The foundation depends on the unit model, ground conditions, loads and local requirements. Confirm the site dimensions, drainage, load-bearing capacity and equipment access before installation.

ShippingHow are folding or flat-pack units shipped?

Shipping depends on the unit design, folding or disassembly method, packed dimensions, order quantity and destination. Some models can be folded or packed as separate parts to improve loading efficiency. Confirm container quantities and the shipping plan using final dimensions, weights and carrier requirements.

PricingAre cleanroom panels usually quoted per square metre?

Cleanroom panels can typically be priced by area. The quote also depends on core material, thickness, facing material, fabrication, quantities, packing and shipping. Custom pieces, trim, doors, windows and installation may be itemized separately.

PaymentCan payment for a cleanroom project be agreed in stages?

Payment stages can be agreed based on the scope of supply, manufacturing, dispatch or construction. The contract should specify the documentation, acceptance criteria and responsibilities for each stage, including the respective milestones for materials delivery and site acceptance.

After-sales supportCan one damaged cleanroom panel be replaced individually?

An individual replacement can be assessed using the existing profile, dimensions, core, finish and joint design. Older batches may differ in color or finish. Keep the original materials list and panel reference for identification.

Standards & testingWhat product or material documents are needed to export modular container buildings?

Requirements depend on the importing country, building use and tender documents. They may include material declarations, performance test reports or other compliance documents. Share the destination and required document list when requesting a quote so the available documentation can be checked.

Have a question about your project?

Share the product type, intended use and destination so we can help with your project.

Contact the Project Team