Installation

Select a question to read the answer.

2 questions
InstallationWhat site preparations are needed before installing cleanroom panels?

Verify site dimensions, structural levels, set-out lines, material storage conditions and coordination with other trades. Check substrate flatness, equipment access routes and environmental protection measures to reduce rework.

InstallationWhat foundation is needed before installing a modular container building?

Prepare a level, stable surface or foundation that meets the project design requirements. The foundation depends on the unit model, ground conditions, loads and local requirements. Confirm the site dimensions, drainage, load-bearing capacity and equipment access before installation.

Have a question about your project?

Share the product type, intended use and destination so we can help with your project.

Contact the Project Team